Battersea Power Station
Service cabinets
Earnshaw Engineering successfully completed the manufacture of 600 RHS Service cabinets for the first phase of the Battersea Power station project.
- Modular construction
- Lightweight ERW section
- Strong rigid design
- Adjustable feet
- Optional reinforcing panel
- Variation of section sizes available
- Product is suitable for CE Marking
- Lifting eyes
Options of finish:
- Standard shot blasted and zinc phosphate primed
- Over 250 colour and finish options
From an off-site facility the skeleton frame was first timber/plasterboard lined, qualified engineers fitted the fabricated carcass out with the pre-installed services required each luxury apartment in this phase.
The project was completed within budget and on time.
Quality control recorded:
- Zero non conformances