London Bridge Station Phase 1

Construction Date
2015 / 2016

    • Previous

Linear light troughs


Linear light trough sections were manufactured painted and fully assembled at the factory. Each module was crated in kit-form to suit the fast track programme. The change of level raking corner profiles completed the linear trough run.

System benefits:

  • Fully accessible
  • Fast installation due to factory assembly
  • Any size up to 4 metres long
  • Lightweight
  • 250 RAL colours available

Another project completed on time and within budget.

Quality control recorded:

  • Zero defects
  • Zero non conformance

Phase one of the refurbishment project at London Bridge station completed 3rd quarter of 2016.

Phase two commences early 2017.