Battersea Power Station

Service cabinets

    Earnshaw Engineering successfully completed the manufacture of 600 RHS Service cabinets for the first phase of the Battersea Power station project.

    • Modular construction
    • Lightweight ERW section
    • Strong rigid design
    • Adjustable feet
    • Optional reinforcing panel
    • Variation of section sizes available
    • Product is suitable for CE Marking
    • Lifting eyes

    Options of finish:

    • Standard shot blasted and zinc phosphate primed
    • Over 250 colour and finish options

    From an off-site facility the skeleton frame was first timber/plasterboard lined, qualified engineers fitted the fabricated carcass out with the pre-installed services required each luxury apartment in this phase.

    The project was completed within budget and on time.

    Quality control recorded:

    • Zero non conformances