London Bridge Station Phase 1
Construction Date
2015 / 2016
Linear light troughs
Linear light trough sections were manufactured painted and fully assembled at the factory. Each module was crated in kit-form to suit the fast track programme. The change of level raking corner profiles completed the linear trough run.
System benefits:
- Fully accessible
- Fast installation due to factory assembly
- Any size up to 4 metres long
- Lightweight
- 250 RAL colours available
Another project completed on time and within budget.
Quality control recorded:
- Zero defects
- Zero non conformance
Phase one of the refurbishment project at London Bridge station completed 3rd quarter of 2016.
Phase two commences early 2017.