London Bridge Station Phase 2
Construction Date
2017
Linear light troughs Phase 2
Continuing with our customer from phase 1, the phase 2 fit out work in London Bridge Station was completed in 2017.
Linear light trough sections were once again manufactured, painted and fully assembled at the factory. All modules were delivered to this prestigious contract in kit-form to suit the fast paced programme. Our ability to deliver direct to site as a FORS silver operator was a major benefit, also ensuring the components arrived on time and intact.